Billerica Board of Health Advances Plan to Move Stormwater Oversight to DPW
BILLERICA — November 6, 2023 — Billerica Board of Health hears proposal to shift stormwater oversight to DPW, sets January public hearing. DPW Stormwater Engineer Christina Papadopoulos presented proposed revisions to Board of Health Chapters 5 and 6 regulations that would formalize a transfer of stormwater permitting authority to the Department of Public Works and introduce a new administrative approval category for projects disturbing 500 square feet or more of impervious area — targeting the two-car garages and smaller additions that have not previously required formal stormwater review. Proposed fees would rise from effectively zero for sub-acre projects to $100, and from $100 to $750 for projects exceeding 10 acres. Health Director Stephen Dresser said DPW has been informally reviewing building permits for stormwater impacts since July 1. The board agreed to send the draft regulations to town counsel KP Law, revisit feedback at its December 4 meeting, and hold a public hearing in January 2024, with a bylaw article carrying the full transfer of authority targeted for Spring 2024 Town Meeting. The board also voted unanimously to grant a two-year stormwater permit extension to CJI Development at 305 Concord Road and approved a floodplain construction variance for 11 Market Street with conditions including stone drainage trenches at both driveways, based on Dresser's finding that a 1982 drainage project had produced a 1,700 percent increase in culvert capacity since the area's 1971 flood study.
Keep reading with a 14-day free trial
Subscribe to The Billerica MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news